Abuja, Nigeria
Firefighting Readiness

Firefighting Readiness

Abuja, NigeriaSolution showcaseCommercial
The challenge

Deliver active firefighting infrastructure that provides the required flow and coverage, remains maintainable and performs predictably when every second matters.

About the project

Ujax engineers active firefighting systems around the building layout, occupancy and fire strategy. Water storage, fire pumps, hydrants, sprinklers, hose reels and portable equipment are coordinated with detection and emergency interfaces. Every zone is inspected, flushed and pressure-tested, with clear documentation for the facility team.

Hydraulic reviewInstallationTestingTraining

WHAT WE DELIVERED

Integrated solutions

Fire pump systemsHydrants and landing valvesAutomatic sprinklersFire hose reelsPortable extinguishersPressure and flow testing

HOW IT WAS DONE

From brief to working system.

Every Ujax project moves through a deliberate engineering process—coordinated, tested and documented at each stage.

01

Coverage review

Reviewed hazard levels, water supply, protected areas and firefighting access across the facility.

02

Hydraulic coordination

Coordinated pumps, pipe sizes, zones, hydrants, sprinklers and hose reels with the building services.

03

Installation

Installed supported and labelled pipework, valves, outlets, pumps and control interfaces.

04

Pressure testing

Flushed and pressure-tested the network, verified pump operation and trained the facility team.

PROJECT GALLERY

Inside the solution

YOUR PROJECT, NEXT

Ready to build something smarter?

Tell us what your space needs to do. We’ll engineer the systems that make it possible.

Request a quote