Device planning
Coordinated the required ELV device positions with the residential layout.

Integrate the required low-power devices throughout the home safely and efficiently.
At residential site in Guzape, Abuja, extra-low-voltage devices were installed to support safe and efficient low-power systems throughout the home. The work provides the residence with coordinated ELV infrastructure while preserving a clean interior finish.
WHAT WE DELIVERED
HOW IT WAS DONE
Every Ujax project moves through a deliberate engineering process—coordinated, tested and documented at each stage.
Coordinated the required ELV device positions with the residential layout.
Prepared the low-voltage routes and connection points required throughout the home.
Installed the specified extra-low-voltage devices with a clean architectural finish.
Verified the installed devices for safe and efficient operation.
PROJECT GALLERY
YOUR PROJECT, NEXT
Tell us what your space needs to do. We’ll engineer the systems that make it possible.
Request a quote ↗